G36-416-07 Two horses on long leading reins and with large stable block in background.jpg

< Previous Next >

G36-416-07 Two horses on long leading reins and with large stable block in background.jpg

Image displayed may not be an exact representation of the image in the library. Colour and contrast may differ.


Image Details

Title Two horses on long leading reins and with large stable block in background
Description A black and white photograph of two horses on long leading reins with two handlers and with a large stable block in background.
Photographer / artist Bustin Studios
Publisher Herefordshire Archive and Records Centre
Contributor(s)
Date [1900-1914]
Type Image
Format Photograph
Identifier G36/416/07
Area Unknown
Collection Holder Herefordshire Archives