G36-416-07 Two horses on long leading reins and with large stable block in background.jpg
G36-416-07 Two horses on long leading reins and with large stable block in background.jpg
Image displayed may not be an exact representation of the image in the library. Colour and contrast may differ.
Image Details
| Title | Two horses on long leading reins and with large stable block in background |
|---|---|
| Description | A black and white photograph of two horses on long leading reins with two handlers and with a large stable block in background. |
| Photographer / artist | Bustin Studios |
| Publisher | Herefordshire Archive and Records Centre |
| Contributor(s) | |
| Date | [1900-1914] |
| Type | Image |
| Format | Photograph |
| Identifier | G36/416/07 |
| Area | Unknown |
| Collection Holder | Herefordshire Archives |